ÖZERŞAH PETROLEUM PRODUCTS AND ENERGY COMP. GEBKİM/DİLOVASI Production area building 67*64,75 meters= 4.300 sqm (H=9 meters-12 meters) steel construction production projects were done, and steel construction manufacturing and assamly work was completed (480ton) . CS. DN50 welded seam pipes assemly for heated oil sector, DN100 welded seam pipes assembly at gress oil raw material section , DN200 welded seamed pioes assembly at vapor aeretion section (1.200 meters) and container production for waste storage area (6*2,5*3 meters) Steel Construction 480 TON 0 2016
GPS PLASTİC COMPANY GEBKİM/DİLOVASI Manufacturing building 42*75meters= 3150sqm (H=1meters), Shades 6*15meters (H=5 meters) and steel construction projects, manufacturing and assamly work was completed, container production for waste storage area.(6*2,5*3 meters) Steel Construction 280 TON 0 2015
KEMPRO RESIN MANUFACTURING AND CHEMİCALS TRADING COMPANY BİRLİK/TUZLA Reactor building of their factory 6*28meters*3 story= 504 sqm (H=10,70meters) steel construction mafacturing projects, and steel construction manufacturing and assamly work was completed.(82 ton) Steel Construction 82 TON 0 2015
TURKUAZ POLYESTHER RESIN MANUFACTURING COMPANY GEBKİM/DİLOVASI Warehouse building 25*60meters= 1.500sqm (H=8meters), Manufacturing building 20*34meters= 680sqm (H=7meters), hot oil buildings 10*12meters= 120sqm (H=6meters), shades 9*60meters (H=5 meters) steel construction manufacturing projects, and steel construction manufacturing and assamly work was completed. Steel Construction 125 TON 0 2015
ANADOLU GLASS WORKS COMPANY GEPOSB/GEBZE Factory buildings and steel construction over office building projects was prepared, steel construction manufacturing and assembly was done 75*80meters= 6.000sqm (H=18,5meters) Steel Construction 510 TON 0 2014
BARTEK ELECTRICAL EQUIPMENT INSTALATION COMPANY İTOSB/TUZLA Factory building and 400 sqm. shades construction projects were made, Steel construction manufacturing and assembly, creyn rails assamly of basement floor was completed 30*70meters= 2.000 sqm (H=12meters) . Steel Construction 170 TON 0 2014
HACIOĞULLARI READY CONCRETE MIXTURES. TUZLA/İST. Steel construction project was made for mechanical repair and maintenance building, including shaded storages were done. 20*25meters= 500m2 (H=12mt) Steel Construction 100 TON 0 2014
ARAS PIPE DOSB/GDİOVASI Steel construction manufacturing and assembly project was completed for factory building, including Creyn rails and related works. 30*80 meters= 2.100 sqm (H=12meters.) Steel Construction 285 TON 0 2013
AYVACI BUILDING GEPOSB/GEBZE Steel construction manufacturing and assembly project was completed for factory building. 45*94mt= 4.300sqm (H=12meters) Steel Construction 330 TON 0 2012
ECE-GERMAN PROJECT MANAGEMENT İN TURKEY BEYLİKDÜZÜ/İST. 9.00*9.00meters= 81sqm (H=5.00 meters) steel construction platform was manufactured and assambled to ıt‘s place at Beylikdüzü Migros Shoppıng center auto park. Steel Construction 15 TON 0 2012