ÖZERŞAH PETROLEUM PRODUCTS AND ENERGY COMP.
|
GEBKİM/DİLOVASI
|
Production area building 67*64,75 meters= 4.300 sqm (H=9 meters-12 meters) steel construction production projects were done, and steel construction manufacturing and assamly work was completed (480ton) . CS. DN50 welded seam pipes assemly for heated oil sector, DN100 welded seam pipes assembly at gress oil raw material section , DN200 welded seamed pioes assembly at vapor aeretion section (1.200 meters) and container production for waste storage area (6*2,5*3 meters)
|
Steel Construction
|
480 TON
|
0
|
2016
|
GPS PLASTİC COMPANY
|
GEBKİM/DİLOVASI
|
Manufacturing building 42*75meters= 3150sqm (H=1meters), Shades 6*15meters (H=5 meters) and steel construction projects, manufacturing and assamly work was completed, container production for waste storage area.(6*2,5*3 meters)
|
Steel Construction
|
280 TON
|
0
|
2015
|
KEMPRO RESIN MANUFACTURING AND CHEMİCALS TRADING COMPANY
|
BİRLİK/TUZLA
|
Reactor building of their factory 6*28meters*3 story= 504 sqm (H=10,70meters) steel construction mafacturing projects, and steel construction manufacturing and assamly work was completed.(82 ton)
|
Steel Construction
|
82 TON
|
0
|
2015
|
TURKUAZ POLYESTHER RESIN MANUFACTURING COMPANY
|
GEBKİM/DİLOVASI
|
Warehouse building 25*60meters= 1.500sqm (H=8meters), Manufacturing building 20*34meters= 680sqm (H=7meters), hot oil buildings 10*12meters= 120sqm (H=6meters), shades 9*60meters (H=5 meters) steel construction manufacturing projects, and steel construction manufacturing and assamly work was completed.
|
Steel Construction
|
125 TON
|
0
|
2015
|
ANADOLU GLASS WORKS COMPANY
|
GEPOSB/GEBZE
|
Factory buildings and steel construction over office building projects was prepared, steel construction manufacturing and assembly was done 75*80meters= 6.000sqm (H=18,5meters)
|
Steel Construction
|
510 TON
|
0
|
2014
|
BARTEK ELECTRICAL EQUIPMENT INSTALATION COMPANY
|
İTOSB/TUZLA
|
Factory building and 400 sqm. shades construction projects were made, Steel construction manufacturing and assembly, creyn rails assamly of basement floor was completed 30*70meters= 2.000 sqm (H=12meters) .
|
Steel Construction
|
170 TON
|
0
|
2014
|
HACIOĞULLARI READY CONCRETE MIXTURES.
|
TUZLA/İST.
|
Steel construction project was made for mechanical repair and maintenance building, including shaded storages were done. 20*25meters= 500m2 (H=12mt)
|
Steel Construction
|
100 TON
|
0
|
2014
|
ARAS PIPE
|
DOSB/GDİOVASI
|
Steel construction manufacturing and assembly project was completed for factory building, including Creyn rails and related works. 30*80 meters= 2.100 sqm (H=12meters.)
|
Steel Construction
|
285 TON
|
0
|
2013
|
AYVACI BUILDING
|
GEPOSB/GEBZE
|
Steel construction manufacturing and assembly project was completed for factory building. 45*94mt= 4.300sqm (H=12meters)
|
Steel Construction
|
330 TON
|
0
|
2012
|
ECE-GERMAN PROJECT MANAGEMENT İN TURKEY
|
BEYLİKDÜZÜ/İST.
|
9.00*9.00meters= 81sqm (H=5.00 meters) steel construction platform was manufactured and assambled to ıt‘s place at Beylikdüzü Migros Shoppıng center auto park.
|
Steel Construction
|
15 TON
|
0
|
2012
|
|